Topic 4: Networks and decision mathematics 1
Trees and minimum connector problems
4 hours
Understand the meaning of tree, spanning tree and minimum spanning tree.
1 interactive
Determine a minimum spanning tree in a weighted connected graph.
1 interactive
Solve practical problems involving minimum spanning trees, e.g. minimising the length of cable needed to provide power from a single power station to substations in several towns.
Project planning and scheduling using critical path analysis (CPA)
8 hours
Construct a project network diagram (activity on arc) to represent the durations and interdependencies of activities that must be completed during the project (excluding dummy activities).
Use forward and backward scanning to determine the earliest starting time (EST) and latest starting time (LST) for each activity in the project.
1 interactive
Use ESTs and LSTs to locate the critical path/s for a project.
Use the critical path to determine the minimum time for a project to be completed.
Calculate float times for non-critical activities.
Solve small-scale practical problems involving critical path analysis.